First Part
ⓘGuided machine setup & run — the official Penta V2 First Part sequence.
Demo Part — Spiral
ⓘOne click sets up the official V2 Spiral demo — ER-40 collet, 1"Ø Delrin rod, tool 10, Spiral G-code.
G-code
0 lines
0 moves
— est. duration
units —
Position
idle- X
- 0.000 mm
- Y
- 0.000 mm
- Z
- 0.000 mm
- A
- 0.000 °
- B
- 0.000 °
- F
- 0 mm/min
Workholding
Real Penta / Lang / Sherline CAD · clamps to the B-table
X ←→
Y up/dn
Z fwd/bk
Drops the part inside the stock; its blue bounding box shows where the part lives in the blank (toggle Bounds).
Tool library
ⓘ T1CAM
ⓘPick operations, then Generate. The path draws on the stock and the G-code loads for Check + Run.
Work offset (G54)
ⓘNot set — part zero unknown
Travel envelope
ⓘ- X115.5 mm
- Y128.3 mm
- Z90.1 mm (Z0 = retracted)
- A-25° to 135°
- Bcontinuous
Kinetic Control
ⓘ0
SPINDLE rpm
100%
FEED
Machine control
ⓘDisconnected
Not connected. "Demo machine" tries the workflow without hardware.